House of Consultants Ltd.

Project

LIST OF PROJECTS UNDERTAKEN

Sector-wise Numbers of Projects undertaken by HCL are listed in the following table
Sl. No. Sectors No. of Completed and Ongoing Projects
1
Water Resources Management
69
2
Master Plan
9
3
Resettlement Action Plan (RAP)
11
4
Education
26
5
Health and Family Planning
11
6
Roads, Transport and Infrastructure Development
15
7
Water Supply and Sanitation
12
8
Fisheries
4
9
Food and Agriculture
12
10
Management/Organizational Restructuring
11
11
Socio-economic, Micro-Credit, Industrial and Market Studies
25
12
Computer Programming, Software Development and System Analysis
6
13
Environment and Forestry
65
14
Power Development
5
15
Telecommunication
19
16
Building and Public Works
16

OVERALL EXPERIENCE

HCL has undertaken a large number of studies in a number of fields and provided back-up and local support services to several world organizations. Particulars of projects undertaken by House of Consultants Ltd. (HCL) are given below. The projects comprise general experience of HCL.

1. IMED (Monitoring & Evaluation)

Sl. No. Name of the Project Client Associate Firm Period Approx.
Value of
Services in
Million Taka
1
Impact Evaluation study on the project: “Higher Education Quality Enhancement Project”
IMED/Ministry of Planning
NA
Feb 2023-June 2023
3.7
2
DLI (Disbursement Linked Indicators) target 9.5: “85% of GPSs have received SLIP funds and utilized them as per the updated SLIP guidelines”
IMED/Ministry of Planning
NA
Dec 2022-Feb 2023
3.0
3
In-Depth Monitoring Study on the project titled “Development of Selected Non-Govt. Secondary Schools”
IMED/Ministry of Planning
NA
Jan 2022-June 2022
3.2
4
In-Depth Monitoring Study on the project titled “Improvement of Different Damage Infrastructure of Dhaka South City Corporation”
IMED/Ministry of Planning
NA
Jan 2020-June 2020
3.2
5
Impact Evaluation study on the project “Construction of a Concreate Grain Silo at Mongla Port with Ancillary Facilities (50000 MT Capacity)’’
IMED/Ministry of Planning
NA
Jan 2019-June 2019
3.2
6
Consultancy Services for Impact Evaluation of Bangladesh Climate Change Trust (BCCT) Funded 90 Projects.
Bangladesh Climate Change Trust (BCCT)
DPDS
Nov 2024-Nov 2025
60
7
Identification of the Key Challenges and Opportunities for the Pharmaceutical Sector in the Post- TRIP Era
Bangladesh Investment Development Authority (BIDA)
NA
May to August 2025
4.0
8
Monitoring and Impact Evaluation of Exhibition/Demonstration of Safe and Nutritious Dairy Products to School Student (School Milk Program).” Under LDDP
Department of Livestock Services (DLS).
HCL Bangladhol LIRA
May to July 2025
15
9
Impact Evaluation of the Development of Power Distribution System in Three Hilly Districts (2nd Revised)
IMED/Ministry of Planning
NA
Nov 2024-April 2025
3.0
10
Impact Evaluation of the project on “School Feeding Programme in Poverty Prone Areas (3rd Revised)”
IMED/Ministry of Planning
NA
Nov 2024-April 2025
3.8
11
DLI target 3.10: At Least 2000 Head Teachers of GPS trained in Classroom Observation and Feedback
IMED/Ministry of Planning
NA
Oct 2024-Dec 2024
3.0
12
In-depth Monitoring of the project on “Fourth Primary Education Development Program (PEDP4) (1st Revised)”
IMED/Ministry of Planning
NA
Dec 2023-April 2024 (Ongoing)
3.8
13
DLI (Disbursement Linked Indicators) Target 3.8: At least 2,000 preprimary teachers complete the specialized training program
IMED/Ministry of Planning
NA
Oct 2023-Nov-2023
3.0
14
The Evaluation on Rural Employment and Road Maintenance Programe -3)
LGED
NA
March-2024-May 2024
2.8

2. Water Resources Management

Sl. No. Name of the Project Client Associate Firm Period Approx.
Value of
Services in
Million Taka
1
Consultancy Services for “Project Management, Design and Supervision of Rehabilitation of Infrastructures damaged by the Cyclone SIDR in 3 (Three) Districts of Southern Bangladesh (Contract Package No. BWDB/C2/S-1)
Bangladesh Water Development Board
Euroconsult, Mott MacDonald, DDC, BCL Associates Ltd.
Dec. 2009- Dec. 2018
Euro 104,000 and Tk. 49.84 million
2
Feasibility Studies and Detail Design (FSDD) of Sub-projects under Small Scale Water Resources Development Project (SSWRDP) in Greater Mymensingh, Sylhet and Faridpur Areas, Package 11, financed by JICA.
Local Government Engineering Department (LGED)
None
Oct. 2010-Dec. 2014
1.48
3
Feasibility Study and Detail Design (FSDD) of Sub-projects under Participatory Small Scale Water Resources Sector Project (PSSWRSP), 3rd Phase
Local Government Engineering Department (LGED)
None
Jul. 2011-Jun. 2014
7.65
4
Updating/Upgrading of Feasibility Study of 3-Sub-Projects under Group-B
Bangladesh Water Development Board (BWDB)
DDC, RPMC
Jan. 2005-Jun. 2005
6.30
5
Chandpur-Comilla Integrated FCDI Project
Bangladesh Water Development Board (BWDB)
BETS, Kranti, DPM
Aug. 2003-Jun. 2005
18.00
6
Second Small Scale Water Resources Development Section Project (SSWRDSP-II): Feasibility Study
Local Government Engineering Department (LGED)
None
Mar. 2003-Jun. 2008
12.00
7
Second Small Scale Water Resources Development Section Project – District Water Resources Assessment
Local Government Engineering Department (LGED)
None
Jul. 2004-Jun. 2007
9.31
8
Feasibility Study of Small scale FCDI Project, Phase-III (Cluster Project)
Bangladesh Water Development Board (BWDB)
DDC, BETS
Nov. 2005-Mar. 2006
4.50
9
National Minor Irrigation/Development Project (EC Component)
Ministry of Agriculture (GOB)/IDA/CEC
Jul. 2004-Jun. 2007
50.00
10
National Minor Irrigation/ Development Project (GOB Component)
Ministry of Agriculture (GOB)/IDA/CEC
Halcrow & Partners, DHV Consultants, AQUA & ACE
May 1993-Jun. 2001
0.70
11
Second Pabna Irrigation and Rural Development Project: Feasibility Study
Asian Development Bank (ADB)
Mott Mac Donald International (UK) and EPC
Apr. 1991- Oct.1991
0.50
12
Gumti Irrigation Phase II: Feasibility Study
World Bank
Mott MacDonald & Partners/ Nippon Koei Co. Ltd.
May 1992- Jul. 1993
3.67
13
Design of a Benefit Monitoring and Evaluation System and Execution of Benchmark Survey under North East Minor Irrigation Project
Ministry of Agriculture
None
May 1995- Dec. 1995
1.85
14
Bangladesh Flood Policy Study (GOB-UNDP)
UNDP/World Bank
None
Nov. 1988- Sep. 1989
54.79
15
Compartmentalization Pilot Project: Flood Action Plan (FAP-20)
Govt. of Netherlands and Germany
Euroconsult (Netherlands) and Lahmeyer (Germany) BETS (Bangladesh)
Jul. 1991- Sep. 1996
9.50
16
South East Region Water Resources Development Programme: Flood Action Plan (FAP-5)
UNDP/World Bank/ BWDB/FPCO
Mott MacDonald Intl Nippon Koei, Desh Upodesh Ltd.
Nov. 1990- July 1993
17.28
17
North Noakhali Irrigation and Drainage Project
UNDP/World Bank/ BWDB/FPCO
Mott MacDonald Intl (UK), and Nippon Koei (Japan), Desh Upodesh
Nov 1990- Jul 1993
5.00
18
North West Regional Study: Flood Action Plan (FAP-2)
ODA and JICA/FPCO
Mott MacDonald Intl (UK), and Nippon Koei (Japan)
Feb. 1991- Dec. 1993
22.50
19
Gaibandha Improvement Project Feasibility Study
ODA and JICA/FPCO
Mott MacDonald Intl (UK), and Nippon Koei (Japan)
Feb. 1992- Jan.1993
7.50
20
Systems Rehabilitation Project of BWDB
European Economic Community (EEC)/ BWDB
Mott MacDonald Intl (UK)
Aug. 1990- Sep. 1991
5.30
21
Topographical/Land Survey for Gaibandha Improvement Project
JICA/Nippon Koei Co. Ltd.
Build Consult International Ltd
Feb.1992- Jun. 1992
6.00
22
Flood Preparedness and Disaster Management in Bangladesh
UNDP
None
Mar. 1989- Apr. 1989
0.64
23
Project Delivery System for the Bangladesh Water Development Board: Support Services
Ministry of Irrigation Water Development and Flood Control
None
Mar. 1990- May 1990
0.23
24
Coastal Embankment Rehabilitation Project, Phase-II, Stage-One
CEC
Jaakko Poyree, DHV, MMI, Desh Upodesh Ltd.
Jun. 1996- Jun. 2000
20.00
25
Coastal Embankment Rehabilitation Project, Phase-II (Mini Package)
World Bank
Jaakko Poyree, DHV, MMI, Desh Upodesh Ltd.
Jul. 2000- Sep. 2001
30.00
26
Coastal Embankment Rehabilitation Project, Phase-II, Stage-Two (Design and Construction Supervision)
CEC
JP Development Oy, DHV, MMI, Desh Upodesh Ltd.
Sep. 2001-Jun 2006
50.00
27
Second Coastal Embankment Rehabilitation Project – Feasibility Study
CEC/World Bank
Jaakko Poyree, DHV, MMI, Devcon. Desh Upodesh Ltd., Technoplanners
Jul. 1999- Oct. 2000
70.00
28
South West Area Water Resources Development Project: Feasibility Study
BWDB/ADB
DHV, Netherlands, L.B., USA, AQUA
Aug.1996- Oct. 1997
10.00
29
Hydrological and Hydraulic Studies on Major Roads of Patuakhali and Barguna Districts
Danish Embassy
ADCL
Oct. 1996- Apr. 1997
2.40
30
Baral Basin Project, Feasibility Study
BWDB
BETS
Sep. 1996- Jun. 1997
1.00
31
BME of Jessore-Khulna Drainage and Rehabilitation Project
BWDB
Kranti Associates Ltd.
2.20
32
Feasibility Study/Survey of Sureswar Pilot Project
BWDB/DAB
DHV, Netherlands, LBII (USA), AQUA, ACE
Dec. 1997- Aug. 1998
4.70
33
National Water Management Plan
WARPO
Mott Macdonald , Halcrow, EPC, BETS, ECBL
Apr. 1998- Oct 2001
12.0
34
Survey of Seven Sub-Projects South West Region of Bangladesh
DHV Group
Progressive Surveyors
Jan. 1989- Apr. 1989
0.50
35
Garai River Restoration Project
BWDB
DHV, Haskoning ACE, DU, BETs, DPM
Sep. 1999- Jun 2001
5.20
36
Feasibility Study of Re-excavation of Betna River and Branch Canals
BWDB
BETS, Krant
Feb. 2000- Jul. 2000
3.00
37
Validation Survey: National Minor Irrigation Census
European Commission
None
Oct. 1997- Jun. 1999
0.60
38
Feasibility Study of Three FCD Projects
BWDB
DDC
3.00
39
Chawkbandi of CAD for MDIP and PIRDP
BWDB
None
9.6
40
Feasibility Study in Ganges Dependent Area Studies
WARPO
Halcro, MMI, BETS, EPC, ECA, Proshika
2.00
41

Engineering Survey, Socio-economic and Environmental Study of Five BWDB Feasibility Study Projects:

 

  • Mrigi River Drainage Improvement Project,
  • Surma Right Bank Project,
  • Bara Baisdia Project (Polder 50/51)
  • Dharmapasha-Rui Beel Project
  • Bakai-Tarki Gournadi Agailjhara Chowdhamadar Beel Project
BWDB
None
Feb. 2001- Jun. 2001
3.00
42

Environmental, Socio-economic and Engineering Survey for:

  • Jadukata Rakti River improvement project
  • Kaierdala Ratna River improvement project
  • South Shudharam Drainage improvement project
  • Chitra River Improvement Project
BWDB
None
Feb. 2000- Jun. 2000
3.00
43
Feasibility Study in Ganges Dependent Area Studies
WARPO
Halcro, MMI, BETS, EPC, ECA, Proshika
2.00
44
Environmental, Socio-economic and Engineering Survey for Tarki-Gournadi-Bamrail Scheme
BWDB
None
Oct. 2001- May 2002
0.279
45
Environmental, Socio-economic and Engineering Survey for Bantala-Banstali Project
BWDB
None
Oct. 2001- May. 2002
0.15
46
Environmental, Socio-economic and Engineering Survey for Kushiyara-Bijna Interbasin Development Project
BWDB
None
Oct. 2001- May. 2002
0.31
47
Environmental, Socio-economic and Engineering Survey for Meghna-Titas Project
BWDB
None
Oct. 2001- May. 2002
0.311
48
Environmental, Socio-economic and Engineering Survey for Bakkhali-Guptakhali-Boalia Khal Irrigaiton Project
BWDB
None
Oct. 2001- May. 2002
0.28
49
Flood Proofing Study: Baseline Survey
CARE, Bangladesh
None
May 2000- Oct. 2000
0.60
50
Feasibility Study of Sagarkhali-Barobeela Drainage Project: Socio-Economic Survey relating to Social Assessment and Initial Environmental Impact Assessment in the Project Area.
Surface water modelling Centre/ Bangladesh Water Development Board
None
Oct.2000- Dec. 2000
0.25
51
Environmental and Fishery Survey for Belai Beel FCDI Project under Feasibility Studies/Survey of New Schemes, 2002-2003
BWDB
None
Jan. 2003-Feb 2003
0.14
52
Environmental and Fishery Survey Jamuna-Padma Left Bank Project under Feasibility Studies/Survey of New Schemes, 2002-2003
BWDB
None
Jan. 2003-Feb 2003
0.13
53
Buriganga-Shitalakhya Project
Institute of Water Management (IWM)
None
0.22
54
Feasibility and Model Study for Rehabilitation of Flood Control Embankment on both Banks of the River Gumti
Institute of Water Management (IWM)
None
0.20
55
Groundwater Management and Zoning Study for Repair and Rehabilitation of Deep Tube Well Project in Greater Dinajpur District
Institute of Water Management (IWM)
None
Aug. 2003- Jun. 2004
0.20
56
Land Use Survey in Pabna Irrigation and Rural Development Project (PIRDP) under Jamuna-Meghna River Erosion Mitigation Project
The Association of North West Hydraulic Consultants, Beller and RPMC (Capacity Building and Project Management for JMREMP)
None
Sep. 2001- Jun. 2002
0.36
57
Behula Command Area Development (CAD) Sub-Project under Second Small Scale Water Resources Development Sector Project (SSWRDSP-2)
Local Government Engineering Department
None
Mar. 2003- Jul. 2003
0.286
58
Mohammadkhani Command Area Development (CAD) Sub-Project under Second Small Scale Water Resources Development Sector Project (SSWRDSP-2)
Local Government Engineering Department
None
Mar. 2003- Nov. 2003
0.30
59
Nayagola Command Area Development (CAD) Sub-Project under Second Small Scale Water Resources Development Sector Project (SSWRDSP-2)
Local Government Engineering Department
None
Mar. 2003- May 2003
0.30
60
Udayan Command Area Development (CAD) Sub-Project under Second Small Scale Water Resources Development Sector Project (SSWRDSP-2)
Local Government Engineering Department
None
Mar. 2005- May 2005
0.155
61
Chechnia Command Area Development (CAD) Sub-Project under Second Small Scale Water Resources Development Sector Project (SSWRDSP-2)
Local Government Engineering Department
None
Mar. 2005- Jun 2005
0.155
62
Sonar Bangla Command Area Development (CAD) Sub-Project under Second Small Scale Water Resources Development Sector Project (SSWRDSP-2)
Local Government Engineering Department
None
Jun. 2005- Dec. 2005
0.155
63
Hogla-Darabaj Command Area Development (CAD) Sub-Project under Second Small Scale Water Resources Development Sector Project (SSWRDSP-2)
Local Government Engineering Department
None
Jan. 2006- Jun. 2006
0.415
64
Hogla-Damosh Command Area Development (CAD) Sub-Project under Second Small Scale Water Resources Development Sector Project (SSWRDSP-2)
Local Government Engineering Department
None
Feb.2006- Jun. 2006
0.315
65
Polash Mohespur Command Area Development (CAD) Sub-Project under Second Small Scale Water Resources Development Sector Project (SSWRDSP-2)
Local Government Engineering Department
None
Jan. 2006- Jul. 2006
0.435
66
Gohal Bari Command Area Development (CAD) Sub-Project under Second Small Scale Water Resources Development Sector Project (SSWRDSP-2)
Local Government Engineering Department
None
an. 2006- Jun. 2006
0.39
67
Feasibility Study on the Development of New Chars in the Vicinity of Boyer Char
Local Government Engineering Department
None
0.39
68
Detail Engineering Design of Kurigram Irrigation Project (North Unit)
Bangladesh Water Development Board
Institute of Water Modelling (IWM), Development Design Consultants Ltd. BETS Consulting Services Ltd.
Mar. 2008- Jun. 2011
7.97
69
Consultancy Services for Detail Engineering Design of Kurigram Irrigation Project (South Unit)
Bangladesh Water Development Board
DDC, ACE, CEGIS, River Research Institute
Apr. 2008- Sep. 2010
1.43

3. Master Plan

Sl. No. Name of the Project Client Associate Firm Period Approx. Value of Services in Million Taka
1
Consulting Services for Preparation of Development for Package-5, Ramu Upazila (391.71 sq km), District: Cox’s Bazar, & Rangunia Upazila (361.54 sq km), District: Chittagong under “Preparation of Development Plan for Fourteen Upazilas” Project
Urban Development Directorate (UDD)
Disaster Management Watch (dm.Watch)
Jan. 2015-Sep. 2017
31.06
2
Preparation of Structure Plan and Action Area Plan for Madaripur and Rajair Upazilas, Madaripur Distric
Urban Development Directorate (UDD)
TROYEE Associates and The decode Limited
Feb. 2013-Jun. 2014
14.48
3
Consulting Services for “Preparation of Master Plan for Pourashavas under District Towns Infrastructure Development Project – Package No. DTIDP/2007-2008/S05” – Dinajpur
Local Government Engineering Department
BETS, SMEC Bangladesh Ltd. (SMEC), BCL Associates Ltd. (BCL)
Jun. 2008-Dec. 2013
2.35
4
Consulting Services for “Preparation of Master Plan for Pourashavas under District Towns Infrastructure Development Project – Package No. DTIDP/2007-2008/S05” – Nilphamari
Local Government Engineering Department
BETS, SMEC Bangladesh Ltd. (SMEC), BCL Associates Ltd. (BCL)
Jun. 2008-Dec. 2013
1.73
5
Consulting Services for “Preparation of Master Plan for Pourashavas under District Towns Infrastructure Development Project – Package No. DTIDP/2007-2008/S05” – Thakurgoan
Local Government Engineering Department
BETS, SMEC Bangladesh Ltd. (SMEC), BCL Associates Ltd. (BCL)
Jun. 2008-Dec. 2013
1.93
6
Consulting Services for “Preparation of Master Plan for Pourashavas under District Towns Infrastructure Development Project – Package No. DTIDP/2007-2008/S05” – Rangpur
Local Government Engineering Department
BETS, SMEC Bangladesh Ltd. (SMEC), BCL Associates Ltd. (BCL)
Jun. 2008-Jun. 2009
0.12
7
Preparation of Master Plan For Pourashavas under Upazila Towns Infrastructure Development Project – Package No.: 02 (two) – Mymensingh
Local Government Engineering Department
BETS Consulting Services Ltd. (BETS) and Aqua Consultants and Associates Ltd. (AQUA)
Mar. 2008-Mar. 2010
8
Consultancy Services for Survey to Mitigate Water Logging Problem in Khulna City
Khulna City Corporation
Sheltech Private Limited
Sep. 2010-Jun. 2012
11.33
9
Forestry Master Plan (Support Services)
Asian Development Bank (ADB)
None
Jul. 1989- Aug. 1989
0.10
10
Consulting services of “Preparation of Comprehensive Development Plan for Twelve Upazilas (Physical Feature Survey with Establishment of BM pillar) [Package-2: Rajapur & kathalia Upazila, District- Jhalakathi]
Urban Development Directorate
HCL STBL PSE
May 2025 to July 2028
16.2
11
Consultancy Services for Preparation of Development work database (GIS Based Database of Roads, Drains and Assets) of Mymensingh City Corporation
Mymensingh City Corporation
HCL Biswas Trader MSS
May 2025 to December 2025
24.0
12
Preparation of Structure Plan and Action Area Plan for Madaripur and Rajair Upazilas, Madaripur District
Urban Development Directorate (UDD)
TROYEE Associates and the decode Limited
Feb. 2013- Jun. 2014
14.48
13
Consulting Services for “Preparation of Master Plan for Pourashavas under District Towns Infrastructure Development Project – Package No. DTIDP/2007-2008/S05” -Dinajpur
Local Government Engineering Department
BETS, SMEC Bangladesh Ltd.(SMEC),BCL Associates Ltd. (BCL)
Jun. 2008- Dec. 2013
2.35
14
Consulting Services for “Preparation of Master Plan for Pourashavas under District Towns Infrastructure Development Project – Package No. DTIDP/2007-2008/S05” -Nilphamari
Local Government Engineering Department
BETS, SMEC Bangladesh Ltd. (SMEC), BCL Associates Ltd. (BCL)
Jun. 2008- Dec. 2013
1.73
15
Consulting Services for “Preparation of Master Plan for Pourashavas under District Towns Infrastructure Development Project – Package No. DTIDP/2007-2008/S05” -Thakurgoan
Local Government Engineering Department
BETS, SMEC Bangladesh Ltd. (SMEC), BCL Associates Ltd. (BCL)
Jun. 2008- Dec. 2013
1.93

4. Resettlement Action Plan (RAP) Projects

Sl. No. Name of the Project Client Associate Firm Period Approx. Value of Services in Million Taka
1
Implementation of RAP in connection with Rehabilitation of Dhaka-Sylhet Road, under the RRMP-III
Roads & Highway Department
ASOD
Aug. 2000- Dec. 2004
17.20
2
Implementation of Resettlement Action Plan (RAP) in connection with Improvement of Feeder Road Type-A under the RRMP-III
Roads & Highway Department
ASOD
Aug. 2000- Aug. 2003
20.50
3
Outstanding Resettlement works of Nalka-Hatikamrul-Banpara New Road Project.
Roads & Highway Department
ASOD
Aug. 2000- Aug. 2001
0.02
4
Consulting Services for Resettlement Plan Implementation
Bangladesh Water Development Board (B|WDB)
Voluntary Rural Development Society (VRDS)
Mar. 2016- Feb. 2019
1,62,00,000
5
Conducting “Environmental Impact Assessment (EIA), Environmental Management Plan (EMP), Socio-economic Impacts Assessment, Assessment of Resettlement Requirements and Preparation of Resettlement Action Plan” for the Feasibility Study for Extension of Existing Underground Mining Operation of Barapukuria Coal Mine”.
BOYD-ME Joint Venture and Barapukuria Coal Mine Authority
None
May 2017 Dec. 2017
7.36
6
Initial Environmental Examination (IEE), Environmental Impact Assessment (EIA), Resettlement Action Plan (RAP) of Gas Distribution Network in South Western Region of Bangladesh
Petrobangla
None
Dec. 2008- Mar. 2009
1.35
7
Initial Environmental Examination (IEE), Environmental Impact Assessment (EIA) and Resettlement Plan (RP) for Dhanua-Savar High Pressure Gas Transmission Pipeline
Gas Transmission Company Limited (GTCL)
None
Jun. 2002- Aug. 2002
0.369
8
Initial Environmental Examination (IEE), Environmental Impact Assessment (EIA and Resettlement Action Plan (RAP) Study on Joydevpur-Kabirpur-Tangail 132 KVA Transmission Line Project
Power Grid Company of Bangladesh
None
Jul. 2002- Sep. 2002
0.289
9
Resettlement Action Plan (RAP) of 3D Seismic Survey and Drilling of Exploration Well Over Magnama Formation
Cairn Energy Sangu Field Limited
None
Oct. 2009- Dec. 2009
0.299
10
Preparation of Resettlement Action Plan (RAP) for Drilling of 4 New Wells (Well #19- 22) and installing 2 numbers of Processing Plants at Titas Gas Field, Brahmanbaria
Bangladesh Gas Fields Company
None
Jan. 2009- Mar. 2009
0.194
11
Preparation of Resettlement Action Plan (RAP) for Drilling of 4 New Wells (Well #19- 22) and installing 2 numbers of Processing Plants at Titas Gas Field, Brahmanbaria
Bangladesh Gas Fields Company
None
Jan. 2009- Mar. 2009
0.194

5. Education and Human Resources Development

Sl. No. Name of the Project Client Associate Firm Period Approx. Value of Services in Million Taka
1
Capacity Utilization in the Technical Training Institutes, Polytechnics and Universities.
Planning Commission, GOB.
None
Oct. 1989- May. 1990
0.55
2
An Evaluation of the Effective Schools Through Enhanced Education Management (ESTEEM) Project
ESTEEM/DFID
None
Dec. 1998- Jan. 1999
18.00
3
Mid-Term Evaluation of Non-Formal Education Project, Phase-I.
Non-Formal Education Project-1 (NFE-1)
None
Jan. 1999- Mar. 1999
0.77
4
Computer Network System Planning and Development
Bangladesh Open University
None
Apr. 1996- Dec. 1996
0.70
5
Cost Sharing Research Project
Cambridge Education Consultant
DPC
Sep. 1999- Dec. 2000
0.85
6
Study on Enrollment Status of 3-5 years Age Group in Early Childhood Care, Education and Development (ECCED)
Ministry of Education – Primary and Mass Education Division
DPC
Sep. 1999- Dec. 1999
0.10
7
Study on Gross Enrollment Rate(GER) /Net Enrollment Rate (NER) of Primary Education including Information on ECCED Programmes and Information on Repeaters
Ministry of Education – Primary and Mass Education Division
DPC
Sep. 1999- Dec. 1999
0.10
8
Study on Qualification of Primary Teachers
Ministry of Education – Primary and Mass Education Division
DPC
Sep. 1999- Dec. 1999
0.10
9
Study on NGO Programmes on Basic Education
Ministry of Education – Primary and Mass Education Division
DPC
Nov. 2001- Jan. 2002
0.10
10
Study on literacy Rate of 15 + Age group
Ministry of Education – Primary and Mass Education Division
DPC
Sep. 1999- Dec. 1999
0.10
11
Data Processing and Database of Child Education and Literacy Survey (CELS), 1999
Ministry of Education
None
Sep. 1999- Dec. 2000
0.50
12
Effective School Through Enhanced Educational Management Project
Cambridge Education Consultants
None
Jul. 1999- Dec. 2004
20.00
13
Assessment of Upazila Resource Centre
Directorate of Primary Education
Ascent
Jul. 2001- Sep. 2001
0.75
14
Tracer Study: Development of 16 Govt. Commercial Institutes Project
Directorate of Secondary and Higher Education
None
Jul. 2001- Aug 2001
0.20
15
Post Literacy and Continuing Education for Human Development, Phase-I
PMED (Now MOPME), DNFE (Now BNFE)
ACCC, ANTEP
Mar. 2002- Feb. 2008
38.20
16
Survey of NGOs’ Management Profile – BEHTRUC – UNICEF
UNICEF
None
Jan. 2002- Jul. 2002
0.90
17
A Study of the Impact for Teacher Characteristics on Student Learning
PIMU, DPE
None
Jan. 2002- May 2002
0.22
18
Contribution of Civil Society Development and Provision of Primary Education in Bangladesh – Educational Inputs (ESTEEM Study-3A)
ESTEEM
None
Sep. 2002- Feb. 2003
0.43
19
Post Literacy and Continuing Education Project-2 (PLCEP-2), Package-1: Project Administration Services (PAS)
PMED (Now MOPME), DNFE (Now BNFE)
ACCC, ANTEP
Jan 2003- Dec 2004
7.00
20
Evaluation Study of the Youth Training and Self-employment Project
IMED, Ministry of Planning
HB Consultants, Rafiul Karim & Associates
Apr. 2005- Jun. 2005
0.79
21
Institutional Review of National Institute of Local Government (NILG)
Unit for Policy Implementation (UPI), Ministry of LGRD
HB Consultants Ltd.
Sep. 2005- Dec. 2005
1.17
22
“A Study on Differential Performance of Secondary Schools” under the Project “Capacity Building of General Economics Division for Preparation of Development Plans”
Planning Commission, Ministry of Planning
None
Aug. 2006- Nov. 2006
0.518
23
“Network Co-ordinating Body” under the project “Reaching Out-of-School Children (ROSC) Project
Directorate of Primary Education
Bangladesh Association for Community Education and Development Project Design and Services Ltd.
Sep. 2006- Aug 2009
151.04
24
Primary Education Development Program- II : Access (TST-4)
Directorate of Primary Education
Association of Community Colleges of Canada (ACCC), Development and Planning Consultants Ltd. (DPC).
Dec. 2006- Nov. 2009
4.00
25
Data Entry, Cleaning and Processing of Primary School Data and Production of Statistical Year Book
Directorate of Primary Education
Techosoft Transcription Ltd.
Aug. 2007- Sep. 2007
5.197
26
Monitoring and providing MIS related support of Post Literacy and Continuing Education Programme under PLCEHDP-2 Project for Barisal Division
Bureau of Non-Formal Education (BNFE)
None
Mar. 2009- Jun. 2012
13.16

6. Health and Family Planning

Sl. No. Name of the Project Client Associate Firm Period Approx. Value of Services in Million Taka
1
Health and Socio-economic Baseline Survey in 21 Demand Side Financing (DSF) and 21 Control Upazilas in 21 Old Districts of Bangladesh under Demand Side Financing Pilot Maternal Health Voucher, Ministry of Health and Family Welfare (MOHFW), GOB.
MOHFW
RADOL
Jan. 2005- Apr. 2005
0.60
2
Baseline Survey of Awareness on SRH in Non-clinical FP, ANC, PNC, Health, HIV/ AIDS/STDs/STIs among the Urban Poor Adolescent Youths.
Marie Stopes Clinics Society
International Resource Development And Management (IRDM)
Jul. 2002- Feb. 2003
0.29
3
Mapping and Situation Assessment of Hotel Based Sex Workers
Marie Stopes Clinics Society
None
Nov. 2003- Mar. 2004
0.44
4
Protection from Violence, Abuse, Exploitation and Discrimination Project of DWA/UNICEF-Child Protection Section in association with Bangladesh Institute of Theatre Arts
UNICEF
None
Jun. 2002- Oct 2002
0.35
5
Evaluation of Logistics and Supply of the Directorate of Family Planning
Bangladesh Planning Commission
None
Nov. 1988- Nov. 1989
0.80
6
Evaluation of the Socio-Economic Development Project for Women
Department of Women Affairs (GOB)
None
Nov. 1987- Jan. 1988
0.30
7
Preparation of an Inventory System for Equipment, Machinery and Transport Procured by the Directorate General of Health.
Implementation, Monitoring and Evaluation Division (MED), Ministry of Planning, GOB.
None
Feb. 1992- Jun. 1992
0.90
8
The Impact of Family Planning Program Performance at District and Upazila level
UNFPA
Multi-disciplinary Action Research Centre (MARC)
Oct. 1989- May. 1990
2.70
9
External Evaluation of the Medical Programme of Terre des Hommes
Terre Des Hommes (Switzerland)
None
Feb.1991- Mar. 1991
0.10
10
Conducting a Survey on IEC Program Implemented by Population Cell of Bangladesh Betar and Bangladesh Television
Directorate of Family Planning
None
Apr. 2006- Jun. 2006
0.69
11
Conducting an Impact Evaluation of Campaign on Long Acting Contraceptive Methods under Information Education and Communication Program
Directorate of Family Planning
None
Apr. 2006- Jun. 2006
0.71

7. Roads, Transport and Infrastructure Development

Sl. No. Name of the Project Client Associate Firm Period Approx. Value of Services in Million Taka
1
Design, Supervision and Monitoring Consultancy (DMC) Services, Package No. LGED/BAIDP/DM/13/01
Bangladesh Agricultural Infrastructure Development Program (BAIDP), Local Government Engineering Department (LGED)
DPC Group, Development Technical Consultants Pvt. Ltd. (DTCL), e.Gen Consultants Ltd.
May 2014-Dec. 2018
1,84,50,000
2
Bangladesh Transport Sector Study
World Bank
DPC
Nov. 1992- Nov. 1993
4.40
3
Dhaka Eastern By-pass, BOT, Feasibility Study
World Bank
Halcrow Fox & ESL
Oct. 1996- Oct. 1997
1.50
4
Inland Water Transport Project : Design and Co-ordination Consultancy
Finnish National Road Administration
None
Oct. 1992- Sep. 1996
26.60
5
Assessment of the Rural Roads Construction under the Integrated Food for Work Programme
USAID
KBN Engineering and Applied Science, Inc. (USA)
Oct 1990- Dec. 1990
0.43
6
Design and Renovation of Corporation Buildings, Stores and Gangways under IWT-3 Project.
FinnRA
None
Jan. 1995- Apr. 1995
1.80
7
Study on the Cost Effectiveness of various Road construction Approaches
IFADEP-GCCR
None
Dec. 1997- Jun. 1998
1.40
8
Study of Labour, Wage Rates, Productivity Norms and Income/ Expenditure Patterns in 1997 Work Season under FFWP
CARE/WFP
None
1.12
9
Upgrading/Updating the Feasibility of Dhaka Integrated Flood Control Embankment and Eastern By-pass
World Bank/ Bangladesh Road Transport Authority
Halcrow Group Ltd. and Halcrow Bangladesh Ltd.
Oct. 1996- Oct 1997
1.50
10
Rural Maintenance Programme (RMP) Household Survey and Socioeconomic Survey
CARE
None
May 1998-Oct. 1999
1.06
11
Implementation of RAP in connection with Rehabilitation of Dhaka-Sylhet Road, under the RRMP-III
Roads & Highway Department
ASOD
Aug. 2000- Dec. 2004
17.20
12
Implementation of RAP in connection with Improvement of Feeder Road Type-A under the RRMP-III
Roads & Highway Department
ASOD
Aug. 2000- Aug. 2003
20.50
13
Outstanding Resettlement works of Nalka-Hatikamrul-Banpara New Road Project.
Roads & Highway Department
ASOD
Aug. 2000- Aug. 2001
0.02
14
Hydraulic and Hydrological Study of Protective Works of Major Roads in Patuakhali and Barguna Districts
Royal Danish Embassy
ADCL
Oct. 1996- Apr. 1997
2.40
15
Design, Supervision and Monitoring of Greater Rajshahi Division Integrated Rural Development Project
LGED
Engineering Science Ltd. BRDS Research and Development
Apr. 2010- Jun.2014
11.46

8. Water Supply and Sanitation

Sl. No. Name of the Project Client Associate Firm Period Approx. Value of Services in Million Taka
1
Coastal Belt Water Supply and Sanitation Project Component under DPHE-DANIDA: Impact on Hygiene Promotion
DPHE/DANIDA
None
May 2004- Nov. 2004
1.25
2
National Survey on Latrine Producers and VSC Market Situation
UNICEF
None
Dec 1992- Jun. 1994
1.62
3
Improved Sanitation Project of Dhaka WASA-IV
Dhaka WASA
Louise Burger/BETS
Jul. 1997- Jul. 1998
2.00
4
Assessment of Damage Caused by Recent Flood in the Sewer System of Dhaka WASA
Dhaka WASA
Louise Berger Int. G K W Consult, BETS, ShellTech, Kranti Associates Ltd.
Jan. 1999- Oct. 1999
2.00
5
Detailed Assessment of Damage Caused and Rehabilitation Required in Water Supply System of Dhaka WASA
Dhaka WASA
Louise Berger Int. G K W Consult, BETs, ShellTech, Kranti Associates Ltd.
Oct. 1999-
2.00
6
Promotion of Sanitation in Bangladesh through Private Sector: Socio-economic Survey of Demand and Supply Parameters in Rural Sanitation
Swiss Development Co-operation/ Interchain Project Consultants AB
None
Nov.1989- May. 1990
0.56
7
Rural Drinking Water Distribution Network (Bogra Pilot Project)
UNCDF
Hydrotechnica, UK
Jan 1989- Apr. 1989
8.75
8
Evaluation of School Sanitation Programme
UNICEF
None
Mar. 1999- Oct. 2000
0.80
9
Institutional Review of the Water Supply and Sanitation Sector, Phase-I Assessment of the NGOs/CBOs
DPHE, UPI
None
Jun. 2002- Nov. 2002
0.697
10
Institutional Review of the Water Supply and Sanitation Sector, Phase-I (Assessment of the Private Sector Institutions)
DPHE, UPI
None
Jun. 2002- Nov. 2002
1.10
11
Institutional Review of the Water Supply and Sanitation Sector, Phase-I (Assessment of the Public Sector Institutions)
DPHE, UPI
None
Jul. 2002- Dec. 2002
1.10
12
“Support Organization“ under the Water Supply and Sanitation Sector Support Programme, Phase II (WSSP-II) in Noagaon District of the Hygiene, Sanitation and Water Supply (HYSAWA) Project
DPHE-DANIDA
ISDCM
Mar. 2008- Aug 2011
20.15

9. Fisheries

Sl. No. Name of the Project Client Associate Firm Period Approx. Value of Services in Million Taka
1
Survey Works under the Integrated Fisheries and Livestock Development Project in Flood Control, Drainage and Other Water Bodies, Phase-I
Ministry of Fisheries and Livestock
None
May, 1996- May, 1997
1.50
2
Survey Works under the Integrated Fisheries and Livestock Development Project in Flood Control, Drainage and Other Water Bodies, Phase-II
Ministry of Fisheries and Livestock
None
Oct.1997- Jun. 1998
4.00
3
Pond Side Training Programme of the IFADEP SP-2 Project
IFADEP-2/Ministry of Fishery
None
Apr. 1999- Jun. 1999
0.57
4
Fourth Fisheries Project
ULG
Eusuf & Associates, Kranti, BCAS
Jun. 2000- May. 2001
6.00

10. Food and Agriculture

Sl. No. Name of the Project Client Associate Firm Period Approx. Value of Services in Million Taka
1
Consultancy Services for Conducting Pest Risk Analysis (PRA) for Mealy Bug Spp. in Bangladesh under the Strengthening Phytosanitary Capacity in Bangladesh Project
Department of Agricultural Extension (DAE), Bangladesh
CRDP Consulting Services (CRDP)
Dec. 2016-Jun. 2017
49,98,500
2
Conducting Pest Risk Analysis (PRA) of Citrus and Cucurbits in Bangladesh and Listing of Quarantine Pest under DAE.
Department of Agricultural Extension (DAE), Bangladesh
Center for Resource Development Studies Ltd (CRDS)
Mar. 2010-May 2010
26,19,000
3
Conducting Pest Risk Analysis (PRA) of Rice in Bangladesh and Listing of Quarantine Pest under DAE
Department of Agricultural Extension (DAE), Bangladesh
Center for Resource Development Studies Ltd (CRDS)
Mar. 2011-May 2011
30,00,000
4
Impact Assessment of Project Intervention of Barisal, Patuakhali, Jhalokathi & Barguna Smallholder Support Project
Department of Agricultural Extension
Center for Resource Development Studies Ltd (CRDS)
May 2007-Jul. 2007
1.99
5
Consulting services for “Agro-Environmental Impact Assessment (AEIA) of Waterlogged Area of Barishal Division”
Bangladesh Agricultural Development Corporation
BETS
Mar. 2010- Jun. 2010
2.50
6
Agricultural Services Innovation & Reform Project (ASIRP)
Department of Agricultural Extension (DAE)
Ascent International Limited
Jan. 2003- Feb. 2003
0.33
7
Agricultural Research Project Phase-II (ARP-II)- Final Evaluation
USAID/TR&D (USA)
None
Mar.1991- Mar.1991
0.30
8
Evaluation of Crop Diversification Programme Market Promotion Campaign.
CEA and Department of Agricultural Marketing
None
Sep. 1994- Dec. 1994
1.00
9
Final Evaluation of the Bangladesh Food Policy (IFPRI Project)
USAID/TR&D Inc.
None
Aug. 1992- Sep. 1992
0.30
10
End Evaluation of North East Minor Irrigation Programme
Ministry of Agriculture
JMS Associates Ltd.
2.00
11
Monitoring of the Storage for WFP Food Supplies
UNDP/UNCDF
None
Sep. 1991- Dec. 1991
3.25
12
Impact Assessment of Soil Fertility and Fertilizer Management Program in Base line and PRA/RRA Upazilas
Department of Agricultural Extension (DAE)
None
Apr. 2006- May. 2006
0.495

11. Management/Organizational Restructuring

Sl. No. Name of the Project Client Associate Firm Period Approx. Value of Services in Million Taka
1
Strengthening of Institutional Framework for Restructuring of Public Manufacturing Enterprises
Asian Development Bank
Crown Agents (UK)
May 1992- Nov. 1993
3.48
2
Management Consultancy for BIWTC
Shiptech Kb (Finland)
None
Oct.1992- Dec.1995
9.40
3
Institutional Strengthening of the Directorate of Women’s Affairs for Non-Farm Employment Creation for Rural Women.
Asian Development Bank
Eusuf & Associate
July. 1992- Jun. 1996
20.00
4
Institutional Strengthening of the Ministry of Relief of Co-ordination of Cyclone Rehabilitation
UNDP
Mott MacDonald Intl (UK) and Asian Disaster Preparedness Centre
May 1992- Dec. 1994
5.12
5
Institutional Development at the Grassroots for Poverty Alleviation
UNDP
None
Sep. 1995- Dec. 1995
0.93
6
Development of Local Consultancy Industry in Bangladesh
Economic Relations Division, Planning Commission
C. Allard & Associates (USA)
May 1990- Dec.1990
3.60
7
Financial Management Upgrade of BPDB and DESA, Phase-I
PDB & DESA
P A Consulting Group
Nov. 1994- Mar.1996
5.60
8
Financial Management Upgrade of DESA, Phase-II
Dhaka Electric Supply Authority
PA Consulting Group
July 1997- Dec. 1999
2.80
9
Problems of the Manufacturing Industries in Bangladesh and Suggestions for Improvement
Ministry of Industries
None
Mar. 1988- Nov. 1989
0.68
10
Strengthening Capacity for Planning at the Local Level
UNDP/Planning Commission, GOB
None
Dec. 1998- Feb. 1999
0.50
11
Study on the Effectiveness of the Group Leaders Extension Workers (GLEW) of the VGD Project
World Food Programme
None
Apr. 1999- May 1999
0.40

12. Socio-economic, Micro Credit, Industrial and Market Studies

Sl. No. Name of the Project Client Associate Firm Period Approx. Value of Services in Million Taka
1
Development of Cottage and Rural Industries in Chittagong Hill Tracts Region
Bangladesh Small and Cottage Industries Corporation
None
Jun. 1989- Mar. 1990
0.25
2
Entrepreneurship Development for Skilled Technicians, Engineers, Wage-Earners and Dependents of Wage Earners.
BSCIC
None
Jun. 1989- Mar. 1990
0.20
3
Women Entrepreneurship Development Programme
BSCIC
None
Jun, 1989- Mar. 1990
0.30
4
A Techno-Economic Feasibility Study on Sreepur Textile Mills Ltd.
Sreepur Textile Mills Ltd.
None
Jan. 1989- Apr. 1890
0.22
5
Market Opportunity Studies on Biscuits, Chocolates, Chewing/Bubble Gums, Cosmetics and Toiletries.
Haque Dandy Bangladesh Ltd/Haque Hankel Cosmetics Ltd.
None
Aug. 1988- Jul. 1990
0.15
6
Inventory of Equipment, Machinery and Transports Procured by Government and Autonomous Organisation
Implementation Monitoring and Evaluation Division, Planning Commission, GOB.
None
Feb.1992- Jun 1992
0.90
7
Feasibility Study on IBN Sina Hospital and Medical Complex.
IBN Sina Hospital
None
Jun. 1993- Sep.1993
0.20
8
Techno Economic Feasibility Study on the Construction of the Head Office of Green Delta Insurance Co. Ltd.
Green Delta Insurance Co. Ltd.
Prasthapana Ltd.
Dec, 1993- Mar. 1994
0.30
9
LPG Market Survey
ESSO Singapore Ltd.
None
Oct, 1997- Dec, 1997
0.30
10
Baseline Survey: Community Empowerment for Rural Poverty Alleviation
UNDP
None
Jul.1998- Feb.1999
1.30
11
Household Survey: Rural Maintenance Programme
USAID/CARE
None
1.10
12
Evaluation of CARE Emergency Loan Assistance Project-2
CARE, Bangladesh
None
May 2001- Sep. 2001
13
Micro Credit Study: Municipal Support Project
LGED
ASA, Techno-planner
Oct. 2000- Jun. 2001
0.7
14
Review of the IGA Components of SHAHAR Project, IFSP
CARE, Bangladesh
None
Jul. 2002- Sep. 2002
0.8
15
Continuous Monitoring of Bangladesh Silk Development Project
Bangladesh Silk Foundation
None
Sep. 1999- Oct. 2003
4.50
16
National Silk Policy of Bangladesh
Ministry of Textile
None
Aug. 2002- Dec. 2002
0.29
17
Past Impact on and Future Need Assessment of Training for Bangladesh Tea Industry
Bangladesh Tea Industry
None
May 2001-Aug. 2001
0.42
18
Evaluation of Industry Park at Sirajganj
Bangladesh Small and Cottage Industries Corporation
None
Nov. 2003- Jan. 2004
0.35
19
Evaluation of Social Mobilization
UNICEF
None
Oct. 1999- Dec.2000
0.70
20
Special Study for Mid-term review of Social Development Programme Project
Social Development Foundation (SDF)
None
Jan. 2006- Mar. 2006
1.33
21
Review of Salary and Benefit Package of USCC-B Staff
Unitarian Services Committee of Canada in Bangladesh ( USCC-B)
None
Jul. 2006- Aug. 2006
0.44
22
Habiganj Knit and Spinning Mills Ltd.
West Mount Group
None
Jun. 2007- Aug 2007
0.40
23
Preparation of a Business Plan for 30,000 Spindles Mills in Bangladesh
Suvastu Group
None
Apr. 2007- Jul. 2007
0.35

13. Computer Programming, Software Development and System Analysis

Sl. No. Name of the Project Client Associate Firm Period Approx. Value of Services in Million Taka
1
ADAB Computerization Project
PRIP/PRACT (USAID)
C. Allard and Associates (USA)
Sep 1989- Nov 1989
0.25
2
Development of Software Package to Computerize Road Survey Data and Earth Work Volume Calculations.
CARE/LGED
None
May.1995- Jun. 1995
0.20
3
Refinement of Earthwork Software Package of IFFD Project
CARE/LGED
None
Jul. 1997- May.1998
0.32
4
Development of Software Package for RDP-16
DANIDA/LGED
None
May 1995- Jun. 1995
0.12
5
Development of a Computerized Inventory System for Equipment, Machinery and Transport Procured by the Directorate of Health
Implementation, Monitoring and Evaluation Division (IMED), Planning Commission (GOB)
None
0.90
6
Data Entry Work for CARE- Disaster Management Work Flood Proofing Project
CARE/USAID
None
May 2000- Sep. 2000
6.00

14. Environment and Forestry

Sl. No. Name of the Project Client Associate Firm Period Approx. Value of Services in Million Taka
1
Consulting Services for Conducting Environmental Impact Assessment (EIA) Study of Construction of Proposed Dhanua-Mymensigh Gas Pipeline Project
Gas Transmission Company Limited (GTCL)
None
Oct. 2021- Mar. 2022
2.47
2
Consulting Services for the “Conducting Environmental Impact Assessment (EIA) of Construction of Gas Transmission Pipeline along Proposed Bangabandhu Sheikh Mujib Railway Bridge Project
Gas Transmission Company Limited (GTCL)
None
June. 2021-Sep. 2021
1.23
3
Consulting services for “Environmental Impact Assessment (EIA) Study for 2D Seismic Survey over Exploration Block 3B, 6B & 7 Project at 18 Districts
Bangladesh Petroleum Exploration & Production Company Ltd. (BAPEX)
None
Feb. 2018-Jun. 2018
0.496
4
Consulting services for “Environmental Impact Assessment (EIA) Study for Rupkalpa #2 Drilling Project at 1 District (Semutang South-1, Upazila: Manikchari, Dist.: Khagrachari)”
Bangladesh Petroleum Exploration & Production Company Ltd. (BAPEX)
None
Jan. 2018-Jul. 2018
0.569
5
Conducting “Environmental Impact Assessment (EIA), Environmental Management Plan (EMP), Socio-economic Impacts Assessment, Assessment of Resettlement Requirements and Prepa-ration of Resettlement Action Plan” for the Feasibility Study for Extension of Existing Underground Mining Operation of Barapukuria Coal Mine”.
BOYD-ME Joint Venture and Barapukuria Coal Mine Authority
None
May 2017 Dec. 2017
7.36
6
Consultant Services for Environmental Impact Assessment (EIA) of Kutumbpur to Meghnaghat Gas Transmission Pipeline Project
Gas Transmission Company Limited (GTCL)
None
Jun. 2017 Sep. 2017
0.69
7
Consulting Services for Conducting Environmental Impact Assessment (EIA) of Proposed Moheshkhali-Anowra Gas Transmission Parallel Pipeline Project
Gas Transmission Company Limited (GTCL)
None
Jan. 2017 Jun. 2017
11,48,400
8
Consulting Services for Environmental Impact Assessment (EIA) Study for 3D Seismic Project of BAPEX
Bangladesh Petroleum Exploration & Production Company Ltd. (BAPEX)
None
Jan. 2014-Jun. 2014
0.99
9
Consulting services for “Environmental Impact Assessment (EIA) Study for Rupgonj Oil/Gas Exploration Well Drilling Project at Rupgonj, Narayangonj”
Bangladesh Petroleum Exploration & Production Company Ltd. (BAPEX)
None
Jan. 2014-Jun. 2014
0.66
10
Consultancy Services for Environmental Impact Assessment (EIA) Study for Sunetra Oil/Gas Exploration Well Drilling Project (Project #1) at Dharmapasha, Sunamgonj
Bangladesh Petroleum Exploration & Production Company Ltd. (BAPEX)
None
Apr. 2012- Sep. 2012
0.52
11
Environmental Impact Assessment (EIA) Studies for Srikail Oil/Gas Exploration Well Drilling Project (Well #02) at Muradnagar, Comilla”
Bangladesh Petroleum Exploration & Production Company Ltd. (BAPEX)
None
May 2010-Jul. 2010
0.52
12
“Environmental Impact Assessment (EIA) Study for Drilling of 5 (five) Wells of BAPEX (Begumgonj Well #3) at Begumgonj, Noakhali”
Bangladesh Petroleum Exploration & Production Company Ltd. (BAPEX)
None
Jan. 2013-May 2013
6,07,422
13
“Environmental Impact Assessment (EIA) Study for Drilling of 5 (five) Wells of BAPEX (Srikail Well #3) at Muradnagar, Comilla”
Bangladesh Petroleum Exploration & Production Company Ltd. (BAPEX)
None
Jan. 2013-Mar. 2013
3,75,000
14
Environmental Impact Assessment (EIA) Study for Work-Over Operation in Well No. 1 & 5 and Installation of A Gas Process Plant at Semutang Gas Field Development Project, Khagrachari
Bangladesh Petroleum Exploration & Production Company Ltd. (BAPEX)
None
Dec. 2008-Mar. 2009
0.499
15
Environmental Impact Assessment (EIA) Report for Shahbajpur Gas Field Appraisal and Development Project.
Bangladesh Petroleum Exploration & Production Company Ltd. (BAPEX)
None
Jun. 2001- May 2002
0.36
16
Environmental Impact Assessment and preparation of resettlement plan for Srikail Exploration Well Drilling Project
Bangladesh Petroleum Exploration & Production Company Ltd. (BAPEX)
None
Dec. 2001- Jun. 2002
0,19
17
Environmental Impact Assessment (EIA) Study for Drilling of an Oil/Gas Exploratory Well at Kapasia, Gazipur
Bangladesh Petroleum Exploration & Production Company Ltd. (BAPEX)
None
Dec. 2008- Mar. 2009
0.46
18
Environmental Impact Assessment (EIA) of Proposed Gas Transmission Pipeline from Srikail Gas Field to A-B Pipeline
Gas Transmission Company Limited (GTCL)
None
Jan. 2013-Feb. 2013
3,29,450
19
Initial Environmental Examination (IEE), Environmental Impact Assessment (EIA), Resettlement Action Plan (RAP) of Gas Distribution Network in South Western Region of Bangladesh
Petrobangla
None
Dec. 2008- Mar. 2009
1.35
20
Initial Environmental Examination (IEE), Environmental Impact Assessment (EIA) and Resettlement Plan (RP) for Dhanua-Savar High Pressure Gas Transmission Pipeline
Gas Transmission Company Limited (GTCL)
None
Jun. 2002- Aug. 2002
0.369
21
Consulting services for “Agro-Environmental Impact Assessment (AEIA) of Waterlogged Area of Barishal Division”
Bangladesh Agricultural Development Corporation
BETS
Mar. 2010- Jun. 2010
2.50
22
Consulting Services for “Environmental Impact Assessment (EIA) Studies of Estuary Development Programme (EDP) Cross Dams”
Bangladesh Water Development Board
None
Dec. 2009- Dec 2010
3.234
23
Initial Environmental Examination (IEE), Environmental Impact Assessment (EIA) Study for Dhaka City and on Dhaka-Chittagong Highway under Dhaka Clean Fuel Project
Rupantorito Prakritik Gas Company Ltd., ADB
None
Jan. 2002- Mar. 2002
0.25
24
Environmental Impact Assessment (EIA) Study for Drilling of Well at Kailastilla Gas Fields (Well #5 & 6) Project
Sylhet Gas Fields Company Limited
None
Aug. 2004- Nov. 2005
0.361
25
Environmental Impact Assessment (EIA) Study for Workover of Well Sylhet #7 Project
Sylhet Gas Fields Limited (GTCL)
None
Nov. 2003 – Dec. 2003
0.34
26
Preparation of IEE, EIA and RAP Reports on Barapukuria 230/132 kV Substation
Power Grid Company Limited of Bangladesh
None
Mar. 2003- May 2003
0.125
27
Environmental Impact Assessment (EIA) of Barapukuria Coal Mine Project
Barapukuria Coal Mining Company Limited (BCMCL)
None
Jan. 2004-Mar 2004
0.27
28
Carrying out of IEE, EIA and RAP for Construction and Extension of Grid Sub-stations including Transmission Line Facilities
Power Grid Company of Bangladesh Ltd.
None
Nov. 2005- Jan. 2006
1.099
29
Initial Environmental Examination (IEE), Environmental Impact Assessment (EIA and Resettlement Action Plan (RAP) Study on Joydevpur-Kabirpur-Tangail 132 KVA Transmission Line Project
Power Grid Company of Bangladesh
None
Jul. 2002- Sep. 2002
0.289
30
Environmental Services for Drilling of Two Wells (Titas #15 and 16) at Titas Gas Field, Brahmanbaria
Bangladesh Gas Fields Company Limited
None
Jul. 2004 – Sep. 2004
0.341
31
Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) Study for Improvement of Access Road connecting the South Pad to the Saidpur Bazar Inathganj LGED Road
Unocal Bangladesh Block Twelve Ltd.
None
Dec. 2004- Nov. 2005
0.264
32
Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) Study for Building the South Pad
Unocal Bangladesh Block Twelve Ltd.
None
Dec. 2004- Nov. 2005
0.264
33
Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) Study for Drilling of Wells on the South Pad
Unocal Bangladesh Block Twelve Ltd.
None
Dec. 2004- Nov. 2005
0.296
34
Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) Study for Drilling of wells on the North Pad and building minimal camp, communication, and office buildings on the Pad
Unocal Bangladesh Block Twelve Ltd.
None
Dec. 2004- Nov. 2005
0.296
35
Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) Study for Gas Production, Testing, and Transport on the North Pad
Unocal Bangladesh Block Twelve Ltd.
None
Dec. 2004- Nov. 2005
0.296
36
Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) Study for Construction of Gas Processing Plant and Camp on South Pad
Unocal Bangladesh Block Twelve Ltd.
None
Dec. 2004- Nov. 2005
0.296
37
Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) Study for Installation of Gathering Line connecting North Pad wells to South Pad Processing Facilities
Unocal Bangladesh Block Twelve Ltd.
None
Dec. 2004- Nov. 2005
0.315
38
Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) Study for Installation of Gas and Condensate Sales Pipeline
Unocal Bangladesh Block Twelve Ltd.
None
Dec. 2004- Nov. 2005
0.319
39
Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) Study for Building a Bridge over the Bibiyana Oxbow Lake (locally known as Bibiyana River)
Unocal Bangladesh Block Twelve Ltd.
None
Dec. 2004- Nov. 2005
0.25
40
Environmental Impact Assessment (EIA) Study for 2D Seismic Survey in PSC Block-7
Unocal Bangladesh Block Twelve Ltd.
None
Jun. 2005- Sep. 2005
0.81
41
Environmental, Social and Health Impact Assessment (ESHIA) Study for Drilling Operation in the Compnayganj Prospect of Block 10
airn Energy Companies in Bangladesh (Cairn)
None
May 2007- Jun. 2007
0.715
42
Environmental, Social and Health Impact Assessment (ESHIA) Study for Block 10 (ESHIA) and Ad-hoc Environmental, Health and Socio-economic and Land Acquisition (ESH) Consultancy Services
Cairn Energy Companies in Bangladesh (Cairn)
None
Jun. 2007- Aug. 2007
0.177
43
Oil Spill Modelling for Magnama Drilling Campaign
Cairn Energy Companies in Bangladesh (Cairn)
None
Nov. 2007- Jan. 2008
1.725
44
Monitoring of Presence of BTEX in soil of Compound of Sangu Gas field processing Facility – Call Off Order No. 003
Cairn Energy Companies in Bangladesh (Cairn)
None
Jun. 2007- Jul. 2007
0.18
45
Monitoring of Plankton and benthos at Magnama Drilling Location – Call Off Order No. 004
Cairn Energy Companies in Bangladesh (Cairn)
None
Sep. 2007- Mar. 2008
0.315
46
Environmental Due Diligence Relinquishment for Block 5 and 10.
Cairn Energy Companies in Bangladesh (Cairn)
None
Jun. 2009- Jul. 2009
0.204
47
Environmental Impact Assessment (EIA) Study on Magnama Onshore Exploration Drilling on Kutubdia Island, Block 16.
Cairn Energy Sangu Field Limited
None
Sep. 2009- Dec 2009
0.32
48
3rd Party Environmental Monitoring of 3D seismic Operations in Kutubdia island (Offshore and Onshore) Block 16, Bangladesh
Cairn Energy Sangu Field Limited, Bangladesh
None
Jan. 2010-May. 2010
0.22
49
Monitoring of Effect of 3D Seismic Operation on Wildlife (Marine Turtle) Visiting Kutubdia
Cairn Energy Sangu Field Limited, Bangladesh
None
Dec. 2009- Apr. 2010
1.00
50
Resettlement Action Plan (RAP) of 3D Seismic Survey and Drilling of Exploration Well Over Magnama Formation
Cairn Energy Sangu Field Limited, Bangladesh
None
Oct. 2009- Dec. 2009
0.299
51
Monitoring of Plankton and Benthos Population at Drilling site in the offshore of Kutubdia
Cairn Energy Sangu Field Limited, Bangladesh
None
May.2008- Jan.2009
0.325
52
Soil Contamination Monitoring at Sangu Processing Facility
Cairn Energy Sangu Field Limited, Bangladesh
None
May.2009- Jun. 2009
0.65
53
Preparation of Resettlement Action Plan (RAP) for Drilling of 4 New Wells (Well #19- 22) and installing 2 numbers of Processing Plants at Titas Gas Field, Brahmanbaria
Bangladesh Gas Fields Company
None
Jan. 2009- Mar. 2009
0.194
54
Environmental Impact Assessment for Resettlement Study for Techno-Economic Feasibility Study of a Deep Sea Port in Bangladesh
Pacific Consultants International (Japan) in association with AEC (Thailand), Dexterous Consultants, JPZ Consulting Ltd. And Devconsultants Ltd.
None
Aug. 2008- Nov. 2008
1.49
55
Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) of Khalashpir Coal Mine Project
Chittagong Water Supply & Sewerage Authority (CWASA)
None
Apr. 2005- Aug. 2005
0.397
57
Study of the Environment of the Barind Tract and Chalan Beel
Ministry of Science and Technology (GOB)
None
Nov. 1993- May 1994
0.10
58
Environmental Knowledge, Attitude and Practice
International Union for Conservation of Nature (IUCN)/MARC
None
Jan,1990- Apr,1990
0.35
59
Environmental Impact Assessment of Flood Control Measures in NW Region of Bangladesh
ODA/MMI
None
Mar.1992- Jul.1992
1.08
60
Update of Inventory on Ozone Depleting Substances Imported and Consumed in Bangladesh for the year 2000
Department of Environment (DOE)
None
Jun. 2001- Dec. 2001
0.4
61
Technical Study to Strengthen Forest Resources Monitoring and Assessment System and Forest Resources Management Information System in Bangladesh Forest Department (Consulting Firm) (Package BFD/S4)
Bangladesh Forest Department
AGRER S.A. NV, Belgium Development Technical Consultants Ltd. (DTCL), Bangladesh House of Consultants Ltd. (HCL), Bangladesh
April 2015-Dec. 2016
US$ 2,54,000 and BD Tk. 1,26,93,750
62
Forestry Sector Project
Department of Forestry
Tecsult, SODEV, EPC
Jan,1998- Dec. 2000
5.00
63
Forestry Master Plan (Support Services)
Asian Development Bank (ADB)
None
Jul. 1989- Aug. 1989
0.10
64
Tree Nursery Survey
Swiss Development Co-operation
None
Jul. 1996- Dec,1996
1.10
65
Selection of Consultancy Firm for the Impact Evaluation of Bangladesh Climate Change Trust (BCCT) Funded 90 Projects.
Bangladesh Climate Change Trust (BCCT)
DPDS
Nov 2024-Nov 2025
60.0

15. Power Development

Sl. No. Name of the Project Client Associate Firm Period Approx. Value of Services in Million Taka
1
Greater Chittagong Power Distribution Project , Phase-III
Bangladesh Power Development Board (BPDB)
NAL, INCO, SMEC & DPC
Oct.2003- Dec. 2007
49.189
2
Consumer Census and Filling of Computer Input Sheet and Pole Numbering of Mymensingh Electric Supply Unit
BPDB
None
Jun.1996- May.1997
1.40
3
Energy Accounting under the Project Financial Management Upgrade, Phase-I
BPDB & DESA
None
Nov. 1994-Mar. 1996
2.6
4
Energy Accounting under the Project Financial Management Upgrade, Phase-II
BPDB & DESA
None
July 1997- Dec. 1999
2.8
5
18 Towns Power Distribution Project
BPDB
PKUL and CEM
6.10
6
Engineering Service for Hasnabad-Amin Bazar-Tongi 230 KV Transmission Line Project (Lot-A, Civil Engineering)
Power Grid Company of Bangladesh (PGCB)
DDC and PCL
Jul. 2002-Jul. 2005
3.44
7
Engineering Service for Hasnabad-Amin Bazar-Tongi 230 KV Transmission Line Project (Lot-B, Electrical)
Power Grid Company of Bangladesh (PGCB)
DDC and PCL
Jul. 2002-Jul. 2005
2.74

16. Telecommunication

Sl. No. Name of the Project Client Associate Firm Period Approx. Value of Services in Million Taka
1
Telecommunication Expansion Project: Dhaka-Khulna Digital Microwave System
Bangladesh T&T Board (BT&TB)
None
Aug. 1989- Feb. 1991
2.20
2
Survey, Planning of Underground Cable Network for 24,000 LU for Greater Dhaka Telecommunication Network Improvement Project, Phase-II.
Bangladesh T&T Board (BT&TB)
None
Jan. 1997- Apr. 1998
1.60
3
Preparation of As-built Drawings of Expansion of 1,26,500 LU Digital in Greater Dhaka Telecommunication Network Improvement Project, Phase-II, Work B.
Bangladesh T&T Board (BT&TB)
None
Jun. 2000- Jan. 2001
1.00
4
Survey, Planning and Preparation of Drawings for Underground Cable Networks in various Upazilas/ Growth Centres of Bangladesh
Bangladesh T&T Board (BT&TB)
None
May. 2001- Feb. 2002
1.14
5
Survey, Planning and Preparation of Drawings for Underground Cable Networks in various Upazilas/Growth Centres of Bangladesh
Bangladesh T&T Board (BT&TB)
None
Dec. 2004- Dec. 2006
0.28
6
Survey, Plan and Design for Copper Cable Network of Gazipur and Munshiganj Exchanges under the project underground Installation and Expansion of 216 KL Digital in Various District Headquarters of Bangladesh.
Bangladesh T&T Board (BT&TB)
None
May. 2001- Feb. 2002
1.20
7
Review of Plan Provision and Supervision of Cable Laying Works for expansion of 26000 LU Digital in 6 Exchanges of Dhaka Multi Exchange Area including the As-built Drawings
Bangladesh T&T Board (BT&TB)
None
Dec. 1989- Dec. 1991
6.00
8
Supervision of Underground Cable Network Expansion 26000 (LU) Digital Telephone Project, Phase-I, BTTB
Bangladesh T&T Board (BT&TB)
None
Feb. 1990- Oct. 1990
6.00
9
Greater Dhaka Telecommu-nication Network Expansion Project (Planning and Supervision), Phase-I
Bangladesh T&T Board (BT&TB)
Nippon Telecommunication Consulting Co. Ltd. (Japan)
Apr. 1993- Mar. 1996
11.00
10
Underground Cable Network Planning and Supervision of 18100 LU Telephone Expansion Project
Bangladesh T&T Board (BT&TB)
Nippon Telecommunication Consulting Co. Ltd. (Japan)
Dec. 1992- Dec. 1995
10.00
11
Survey, Plan, Design of Underground Cable Network for 102,500 LU Digital for Greater Dhaka Telecom. Network Improvement Project, Phase-II, Work-B with additional 35,000 LU Digital.
Bangladesh T&T Board (BT&TB)
None
Nov. 1997- Oct. 2000
10.40
12
Survey and Design of Greater Dhaka Tele-Communication Network Improvement Project, Phase-II
BT&TB Marubeni, Japan
None
Nov. 1999- Feb. 2001
2.00
13
Preparation of As Built Drawing Greater Dhaka Telecommunication Network Improvement Project, Phase-II
Marubeni, Japan
None
May.1999- Dec. 1999
2.61
14
Supervision of Outside Plan(OSP) of Installation and Expansion of Digital Telephone Exchanges in various District Head Quarters of Bangladesh
Bangladesh T&T Board (BT&TB)
None
Apr. 2001- Jun. 2002
11.14
15
Consultancy Services in Survey, Plan, Design and Preparation of BOQ in Upazila and Growth Centre Project of BTTB
Bangladesh T&T Board (BT&TB)
None
Jul. 2004- Mar. 2005
0.83
16
Rendering Consulting Services for supervision of underground cable network (OSP) under the project “Installation Digital Telephone Exchanges at Chittagong, Sylhet and Khulna”.
Rendering Consulting Services for supervision of underground cable network (OSP) under the project “Installation Digital Telephone Exchanges at Chittagong, Sylhet and Khulna”.
None
Feb. 2006- Jul. 2006
0.62
17
Rendering Consulting Services for Telecom Towers Construction works at 8 (eight) Upazila/ Growth Centres under the project, “Installation and Expansion of Digital Telephone Exchanges at Different District Headquarters in Bangladesh”
Bangladesh T&T Board (BT&TB)
None
Mar. 2006- Apr. 2006
0.20
18
Rendering Consulting Services for Survey, Plan, Design and Preparation of BOQ under the project, “Installation of Digital Telephone Exchanges at Upazila/Growth Centres”
Bangladesh T&T Board (BT&TB)
None
Jul. 2004- Jul. 2006
0.70
19
Rendering Consulting Services for Supervision of Upazila/ Growth Centres under the project, “Installation of Digital Telephone Exchanges at Upazila/Growth Centres”
Bangladesh T&T Board (BT&TB)
None
Jan. 2004- Dec. 2006
1.20

17. Building and Public Services

Sl. No. Name of the Project Client Associate Firm Period Approx. Value of Services in Million Taka
1
Construction of 2-storied Modern Guest House with 6-storied foundation Covering 3000 sft. Floor area each floor at Bangladesh Bank premises Bogra
Bangladesh Bank
Riddhi Architect
Apr. 2009- Dec. 2013
0.45
2
Design and Supervision of Ananta Ananda Tourist Spot
Ananta Ananda
None
Apr. 1994- Mar. 1996
1.00
3
Construction of 6-storied Residential Building
Mr. Borhanuddin
None
Nov.1999- Oct. 2001
0.90
4
Construction of 6-storied Residential Building
Mrs. Lutfunnessa
None
Oct. 2003- Oct. 2005
1.00
5
Construction of 5-storied Residential Building
S N Anwar & Brothers
None
Mar. 2002- Nov. 2005
0.60
6
Plan, Design and Construction Supervision of 7-Storied Building at Panthapath, Dhaka.
D S S Abedin
None
Jun. 2004- Jul. 2006
0.60
7
Plan, Design and Construction Supervision of 6-storied Building of GHASHFUL, X/11, Noorjahan Road, Mohammadpur, Dhaka.
Mrs. Najibun Nahar
None
Jan. 1999- Apr. 2000
0.50
8
Consultancy Services for Construction of 10-storied and one Basement Residential Building (each Floor Area = 4139 sft).
Venus Corporation
None
Mar. 2011-Dec. 2013
2.555
9
Consultancy Services for Construction of 10-storied and one Basement Residential Building (each Floor Area = 4223 sft).
Venus Corporation
None
Jan. 2012-Dec. 2014
2.596
10
Consultancy Services for Construction of 10-storied Residential Building (each Floor Area = 4531 sft).
Holy Dream Properties Ltd., Manikdee,Namapara, Cantonment, Dhaka
None
Feb. 2011- Jan. 2014
2.265
11
Consultancy Services for Construction of 10-storied Residential Building with one Basement (Each Floor Area = 4139 sft).
Kutub Miah & Mrs. Rokeya Begum, Kallyanpur, Mirpur, Dhaka
None
Apr. 2011-Mar. 2014
2.27
12
Consultancy Services for Construction works of 10-storied Residential Building (each Floor Area = 5603 sft).
Holy Dream Properties Ltd., CS Dag: 248, 256 (Part), Joarshahara, Dhaka
None
Apr. 2012- Mar. 2015
2.80
13
Consultancy Services for Construction of 10-storied Residential Building with one Basement (Each Floor Area = 4183 sft)
High Dream Properties Ltd., South Manikdi, Dhaka Cantonment, Dhaka
None
Jun. 2013- May 2016
2.30
14
Consultancy Services for Construction of 8-storied 2 nos. Residential Building (each Floor Area = 1996 sft)
Dinnath Shen Road, Sutrapur, Dhaka
None
Jan. 2013- Dec. 2014
1.59
15
Consultancy Services for Construction of 8-storied Residential Building (each Floor Area = 2007 sft
Md. Abdul Haque Sardar, Nobodouy Housing Society, Mohammadpur, Dhaka
None
July 2013- June 2015
0.642
16
Consultancy Services for Construction of 18-storied Commercial Building (each Floor Area = 3470 sft).
Dr. Emdadul Haque, Kemal Ataturk Avenue, Banani, Dhaka
None
April 2000- Dec. 2005
3.123
17
Consultancy Services for Construction of 15-storied Commercial-cum-Residential Building (each Floor Area = 4390 sft).
Md. Noor Islam, Progati Sarani, Badda, Dhaka.
None
April 2007- Dec. 2012
1.975
18
Consultancy Services for Construction of 6-storied Residential Building (each Floor Area = 2880 sft).
Mr. Mizanur Rahman, Uttara, Dhaka
None
April 2006- June 2007
0.345

Our Projects

14-STORIED DHAKA STOCK EXCHANGE

ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES FOR CONSTRUCTION OF MULTI-STORIED (14-STORIED) OFFICE BUILDING…
READ MORE

18-STORIED FAREAST ISLAMI LIFE...

ARCHITECTURAL AND ENGINEERING CONSULTANCY SERVICES FOR CONSTRUCTION OF A MULTI-STORIED…
READ MORE

20- STORIED POWER GRID COMPANY...

CONSULTANCY SERVICES FOR CONSTRUCTION OF PGCB HEAD OFFICE BUILDING (20-STORIED) AT RAMPURA NLDC PREMISES…
READ MORE

13-STORIED ROADS AND HIGHWAYS...

ONSULTANCY SERVICES FOR DESIGN AND SUPERVISION OF RHD HEADQUARTERS COMPLEX (13-STORIED). The proposed RHD…
READ MORE

DHAKA MASS RAPID TRANSIT

CONSULTANCY SERVICES FOR DESIGN, CONSTRUCTION SUPERVISION, PROCUREMENT SUPPORT AND MANAGEMENT….
READ MORE

MATARBARI ULTRA SUPER CRITICAL ...

CONSULTING SERVICES FOR DESIGN AND SUPERVISION OF MATARBARI ULTRA SUPER CRITICAL COAL-FIRED POWER PROJECT (JICA…
READ MORE

13-STORIED DHAKA TRASPORT CO-ORDINATION...

CONSULTANCY SERVICES FOR DESIGN AND SUPERVISION OF DTCA HEADQUARTERS COMPLEX AT TEJGAON, DHAKA (13-STORIED).
READ MORE

DHAKA METROPOLITAN DEVELOPMENT PLAN...

CONSULTANCY SERVICES FOR PREPARATION OF DETAILED AREA PLAN (2016-2035) FOR DMDP AREA (LOT 2: PART-B). …
READ MORE

24-STORIED AUB BUILDING COMPLEX

CONSULTANCY SERVICES FOR CONSTRUCTION OF 3 BASEMENTS + 24-STORIED AUB BUILDING COMPLEX AT PLOT NO….
READ MORE

7-14 STORIED BUILDING

ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES FOR CONSTRUCTION OF MULTI-STORIED (14-STORIED) OFFICE BUILDING…
READ MORE

BANGABANDHU SHEIKH MUJIB RAILWAY

ARCHITECTURAL AND ENGINEERING CONSULTANCY SERVICES FOR CONSTRUCTION OF A MULTI-STORIED…
READ MORE

URBAN BUILDING SAFETY PROJECT

CONSULTANCY SERVICES FOR CONSTRUCTION OF PGCB HEAD OFFICE BUILDING (20-STORIED) AT RAMPURA NLDC PREMISES…
READ MORE