Environment and Forestry

Sl. No. Name of the Project Client Associate Firm Period Approx. Value of Services in Million Taka
1
Consulting Services for Conducting Environmental Impact Assessment (EIA) Study of Construction of Proposed Dhanua-Mymensigh Gas Pipeline Project
Gas Transmission Company Limited (GTCL)
None
Oct. 2021- Mar. 2022
2.47
2
Consulting Services for the “Conducting Environmental Impact Assessment (EIA) of Construction of Gas Transmission Pipeline along Proposed Bangabandhu Sheikh Mujib Railway Bridge Project
Gas Transmission Company Limited (GTCL)
None
June. 2021-Sep. 2021
1.23
3
Consulting services for “Environmental Impact Assessment (EIA) Study for 2D Seismic Survey over Exploration Block 3B, 6B & 7 Project at 18 Districts
Bangladesh Petroleum Exploration & Production Company Ltd. (BAPEX)
None
Feb. 2018-Jun. 2018
0.496
4
Consulting services for “Environmental Impact Assessment (EIA) Study for Rupkalpa #2 Drilling Project at 1 District (Semutang South-1, Upazila: Manikchari, Dist.: Khagrachari)”
Bangladesh Petroleum Exploration & Production Company Ltd. (BAPEX)
None
Jan. 2018-Jul. 2018
0.569
5
Conducting “Environmental Impact Assessment (EIA), Environmental Management Plan (EMP), Socio-economic Impacts Assessment, Assessment of Resettlement Requirements and Prepa-ration of Resettlement Action Plan” for the Feasibility Study for Extension of Existing Underground Mining Operation of Barapukuria Coal Mine”.
BOYD-ME Joint Venture and Barapukuria Coal Mine Authority
None
May 2017 Dec. 2017
7.36
6
Consultant Services for Environmental Impact Assessment (EIA) of Kutumbpur to Meghnaghat Gas Transmission Pipeline Project
Gas Transmission Company Limited (GTCL)
None
Jun. 2017 Sep. 2017
0.69
7
Consulting Services for Conducting Environmental Impact Assessment (EIA) of Proposed Moheshkhali-Anowra Gas Transmission Parallel Pipeline Project
Gas Transmission Company Limited (GTCL)
None
Jan. 2017 Jun. 2017
11,48,400
8
Consulting Services for Environmental Impact Assessment (EIA) Study for 3D Seismic Project of BAPEX
Bangladesh Petroleum Exploration & Production Company Ltd. (BAPEX)
None
Jan. 2014-Jun. 2014
0.99
9
Consulting services for “Environmental Impact Assessment (EIA) Study for Rupgonj Oil/Gas Exploration Well Drilling Project at Rupgonj, Narayangonj”
Bangladesh Petroleum Exploration & Production Company Ltd. (BAPEX)
None
Jan. 2014-Jun. 2014
0.66
10
Consultancy Services for Environmental Impact Assessment (EIA) Study for Sunetra Oil/Gas Exploration Well Drilling Project (Project #1) at Dharmapasha, Sunamgonj
Bangladesh Petroleum Exploration & Production Company Ltd. (BAPEX)
None
Apr. 2012- Sep. 2012
0.52
11
Environmental Impact Assessment (EIA) Studies for Srikail Oil/Gas Exploration Well Drilling Project (Well #02) at Muradnagar, Comilla”
Bangladesh Petroleum Exploration & Production Company Ltd. (BAPEX)
None
May 2010-Jul. 2010
0.52
12
“Environmental Impact Assessment (EIA) Study for Drilling of 5 (five) Wells of BAPEX (Begumgonj Well #3) at Begumgonj, Noakhali”
Bangladesh Petroleum Exploration & Production Company Ltd. (BAPEX)
None
Jan. 2013-May 2013
6,07,422
13
“Environmental Impact Assessment (EIA) Study for Drilling of 5 (five) Wells of BAPEX (Srikail Well #3) at Muradnagar, Comilla”
Bangladesh Petroleum Exploration & Production Company Ltd. (BAPEX)
None
Jan. 2013-Mar. 2013
3,75,000
14
Environmental Impact Assessment (EIA) Study for Work-Over Operation in Well No. 1 & 5 and Installation of A Gas Process Plant at Semutang Gas Field Development Project, Khagrachari
Bangladesh Petroleum Exploration & Production Company Ltd. (BAPEX)
None
Dec. 2008-Mar. 2009
0.499
15
Environmental Impact Assessment (EIA) Report for Shahbajpur Gas Field Appraisal and Development Project.
Bangladesh Petroleum Exploration & Production Company Ltd. (BAPEX)
None
Jun. 2001- May 2002
0.36
16
Environmental Impact Assessment and preparation of resettlement plan for Srikail Exploration Well Drilling Project
Bangladesh Petroleum Exploration & Production Company Ltd. (BAPEX)
None
Dec. 2001- Jun. 2002
0,19
17
Environmental Impact Assessment (EIA) Study for Drilling of an Oil/Gas Exploratory Well at Kapasia, Gazipur
Bangladesh Petroleum Exploration & Production Company Ltd. (BAPEX)
None
Dec. 2008- Mar. 2009
0.46
18
Environmental Impact Assessment (EIA) of Proposed Gas Transmission Pipeline from Srikail Gas Field to A-B Pipeline
Gas Transmission Company Limited (GTCL)
None
Jan. 2013-Feb. 2013
3,29,450
19
Initial Environmental Examination (IEE), Environmental Impact Assessment (EIA), Resettlement Action Plan (RAP) of Gas Distribution Network in South Western Region of Bangladesh
Petrobangla
None
Dec. 2008- Mar. 2009
1.35
20
Initial Environmental Examination (IEE), Environmental Impact Assessment (EIA) and Resettlement Plan (RP) for Dhanua-Savar High Pressure Gas Transmission Pipeline
Gas Transmission Company Limited (GTCL)
None
Jun. 2002- Aug. 2002
0.369
21
Consulting services for “Agro-Environmental Impact Assessment (AEIA) of Waterlogged Area of Barishal Division”
Bangladesh Agricultural Development Corporation
BETS
Mar. 2010- Jun. 2010
2.50
22
Consulting Services for “Environmental Impact Assessment (EIA) Studies of Estuary Development Programme (EDP) Cross Dams”
Bangladesh Water Development Board
None
Dec. 2009- Dec 2010
3.234
23
Initial Environmental Examination (IEE), Environmental Impact Assessment (EIA) Study for Dhaka City and on Dhaka-Chittagong Highway under Dhaka Clean Fuel Project
Rupantorito Prakritik Gas Company Ltd., ADB
None
Jan. 2002- Mar. 2002
0.25
24
Environmental Impact Assessment (EIA) Study for Drilling of Well at Kailastilla Gas Fields (Well #5 & 6) Project
Sylhet Gas Fields Company Limited
None
Aug. 2004- Nov. 2005
0.361
25
Environmental Impact Assessment (EIA) Study for Workover of Well Sylhet #7 Project
Sylhet Gas Fields Limited (GTCL)
None
Nov. 2003 – Dec. 2003
0.34
26
Preparation of IEE, EIA and RAP Reports on Barapukuria 230/132 kV Substation
Power Grid Company Limited of Bangladesh
None
Mar. 2003- May 2003
0.125
27
Environmental Impact Assessment (EIA) of Barapukuria Coal Mine Project
Barapukuria Coal Mining Company Limited (BCMCL)
None
Jan. 2004-Mar 2004
0.27
28
Carrying out of IEE, EIA and RAP for Construction and Extension of Grid Sub-stations including Transmission Line Facilities
Power Grid Company of Bangladesh Ltd.
None
Nov. 2005- Jan. 2006
1.099
29
Initial Environmental Examination (IEE), Environmental Impact Assessment (EIA and Resettlement Action Plan (RAP) Study on Joydevpur-Kabirpur-Tangail 132 KVA Transmission Line Project
Power Grid Company of Bangladesh
None
Jul. 2002- Sep. 2002
0.289
30
Environmental Services for Drilling of Two Wells (Titas #15 and 16) at Titas Gas Field, Brahmanbaria
Bangladesh Gas Fields Company Limited
None
Jul. 2004 – Sep. 2004
0.341
31
Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) Study for Improvement of Access Road connecting the South Pad to the Saidpur Bazar Inathganj LGED Road
Unocal Bangladesh Block Twelve Ltd.
None
Dec. 2004- Nov. 2005
0.264
32
Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) Study for Building the South Pad
Unocal Bangladesh Block Twelve Ltd.
None
Dec. 2004- Nov. 2005
0.264
33
Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) Study for Drilling of Wells on the South Pad
Unocal Bangladesh Block Twelve Ltd.
None
Dec. 2004- Nov. 2005
0.296
34
Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) Study for Drilling of wells on the North Pad and building minimal camp, communication, and office buildings on the Pad
Unocal Bangladesh Block Twelve Ltd.
None
Dec. 2004- Nov. 2005
0.296
35
Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) Study for Gas Production, Testing, and Transport on the North Pad
Unocal Bangladesh Block Twelve Ltd.
None
Dec. 2004- Nov. 2005
0.296
36
Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) Study for Construction of Gas Processing Plant and Camp on South Pad
Unocal Bangladesh Block Twelve Ltd.
None
Dec. 2004- Nov. 2005
0.296
37
Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) Study for Installation of Gathering Line connecting North Pad wells to South Pad Processing Facilities
Unocal Bangladesh Block Twelve Ltd.
None
Dec. 2004- Nov. 2005
0.315
38
Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) Study for Installation of Gas and Condensate Sales Pipeline
Unocal Bangladesh Block Twelve Ltd.
None
Dec. 2004- Nov. 2005
0.319
39
Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) Study for Building a Bridge over the Bibiyana Oxbow Lake (locally known as Bibiyana River)
Unocal Bangladesh Block Twelve Ltd.
None
Dec. 2004- Nov. 2005
0.25
40
Environmental Impact Assessment (EIA) Study for 2D Seismic Survey in PSC Block-7
Unocal Bangladesh Block Twelve Ltd.
None
Jun. 2005- Sep. 2005
0.81
41
Environmental, Social and Health Impact Assessment (ESHIA) Study for Drilling Operation in the Compnayganj Prospect of Block 10
airn Energy Companies in Bangladesh (Cairn)
None
May 2007- Jun. 2007
0.715
42
Environmental, Social and Health Impact Assessment (ESHIA) Study for Block 10 (ESHIA) and Ad-hoc Environmental, Health and Socio-economic and Land Acquisition (ESH) Consultancy Services
Cairn Energy Companies in Bangladesh (Cairn)
None
Jun. 2007- Aug. 2007
0.177
43
Oil Spill Modelling for Magnama Drilling Campaign
Cairn Energy Companies in Bangladesh (Cairn)
None
Nov. 2007- Jan. 2008
1.725
44
Monitoring of Presence of BTEX in soil of Compound of Sangu Gas field processing Facility – Call Off Order No. 003
Cairn Energy Companies in Bangladesh (Cairn)
None
Jun. 2007- Jul. 2007
0.18
45
Monitoring of Plankton and benthos at Magnama Drilling Location – Call Off Order No. 004
Cairn Energy Companies in Bangladesh (Cairn)
None
Sep. 2007- Mar. 2008
0.315
46
Environmental Due Diligence Relinquishment for Block 5 and 10.
Cairn Energy Companies in Bangladesh (Cairn)
None
Jun. 2009- Jul. 2009
0.204
47
Environmental Impact Assessment (EIA) Study on Magnama Onshore Exploration Drilling on Kutubdia Island, Block 16.
Cairn Energy Sangu Field Limited
None
Sep. 2009- Dec 2009
0.32
48
3rd Party Environmental Monitoring of 3D seismic Operations in Kutubdia island (Offshore and Onshore) Block 16, Bangladesh
Cairn Energy Sangu Field Limited, Bangladesh
None
Jan. 2010-May. 2010
0.22
49
Monitoring of Effect of 3D Seismic Operation on Wildlife (Marine Turtle) Visiting Kutubdia
Cairn Energy Sangu Field Limited, Bangladesh
None
Dec. 2009- Apr. 2010
1.00
50
Resettlement Action Plan (RAP) of 3D Seismic Survey and Drilling of Exploration Well Over Magnama Formation
Cairn Energy Sangu Field Limited, Bangladesh
None
Oct. 2009- Dec. 2009
0.299
51
Monitoring of Plankton and Benthos Population at Drilling site in the offshore of Kutubdia
Cairn Energy Sangu Field Limited, Bangladesh
None
May.2008- Jan.2009
0.325
52
Soil Contamination Monitoring at Sangu Processing Facility
Cairn Energy Sangu Field Limited, Bangladesh
None
May.2009- Jun. 2009
0.65
53
Preparation of Resettlement Action Plan (RAP) for Drilling of 4 New Wells (Well #19- 22) and installing 2 numbers of Processing Plants at Titas Gas Field, Brahmanbaria
Bangladesh Gas Fields Company
None
Jan. 2009- Mar. 2009
0.194
54
Environmental Impact Assessment for Resettlement Study for Techno-Economic Feasibility Study of a Deep Sea Port in Bangladesh
Pacific Consultants International (Japan) in association with AEC (Thailand), Dexterous Consultants, JPZ Consulting Ltd. And Devconsultants Ltd.
None
Aug. 2008- Nov. 2008
1.49
55
Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) of Khalashpir Coal Mine Project
Chittagong Water Supply & Sewerage Authority (CWASA)
None
Apr. 2005- Aug. 2005
0.397
57
Study of the Environment of the Barind Tract and Chalan Beel
Ministry of Science and Technology (GOB)
None
Nov. 1993- May 1994
0.10
58
Environmental Knowledge, Attitude and Practice
International Union for Conservation of Nature (IUCN)/MARC
None
Jan,1990- Apr,1990
0.35
59
Environmental Impact Assessment of Flood Control Measures in NW Region of Bangladesh
ODA/MMI
None
Mar.1992- Jul.1992
1.08
60
Update of Inventory on Ozone Depleting Substances Imported and Consumed in Bangladesh for the year 2000
Department of Environment (DOE)
None
Jun. 2001- Dec. 2001
0.4
61
Technical Study to Strengthen Forest Resources Monitoring and Assessment System and Forest Resources Management Information System in Bangladesh Forest Department (Consulting Firm) (Package BFD/S4)
Bangladesh Forest Department
AGRER S.A. NV, Belgium Development Technical Consultants Ltd. (DTCL), Bangladesh House of Consultants Ltd. (HCL), Bangladesh
April 2015-Dec. 2016
US$ 2,54,000 and BD Tk. 1,26,93,750
62
Forestry Sector Project
Department of Forestry
Tecsult, SODEV, EPC
Jan,1998- Dec. 2000
5.00
63
Forestry Master Plan (Support Services)
Asian Development Bank (ADB)
None
Jul. 1989- Aug. 1989
0.10
64
Tree Nursery Survey
Swiss Development Co-operation
None
Jul. 1996- Dec,1996
1.10
65
Selection of Consultancy Firm for the Impact Evaluation of Bangladesh Climate Change Trust (BCCT) Funded 90 Projects.
Bangladesh Climate Change Trust (BCCT)
DPDS
Nov 2024-Nov 2025
60.0